<tr id="kyiui"><td id="kyiui"></td></tr><ul id="kyiui"><pre id="kyiui"></pre></ul>
<samp id="kyiui"></samp>
  • <samp id="kyiui"></samp>
    <th id="kyiui"><menu id="kyiui"></menu></th>
    <samp id="kyiui"></samp>
  • <th id="kyiui"><menu id="kyiui"></menu></th>
    <ul id="kyiui"><center id="kyiui"></center></ul>
  • <ul id="kyiui"><tbody id="kyiui"></tbody></ul>
    一本色道久久综合亚洲精品小说,日韩亚洲国产一区情侣,亚洲成人电影在线观看精品国产,亚洲乱码AV一区二区,国产精品公开免费视频,精品手机在线视频,精品人无码一区二区三区,一区二区二区三区av

    Jiangmen hardware accessories factory analyzes its mold processing process arrangement

    2019-12-29 1687

      Mold making refers to the processing of forming and blank making tools, in addition to shear mold and die-cutting mold. Generally, the mold has two parts: upper mold and lower mold. The steel plate is placed between the upper and lower dies to realize the material forming under the action of the press. When the press is opened, the workpiece determined by the die shape will be obtained or the corresponding waste materials will be removed. As small as electronic connector, as large as the automobile dashboard, the workpiece can be molded with mold. Progressive die refers to a set of die which can automatically move the workpiece from one station to another and get the forming parts at the last station. Die processing technology includes: cutting die, blanking die, compound die, extrusion die, four slide die, progressive die, stamping die, die cutting die, etc.

      Process flow arrangement

      1. Bottom surface processing, processing quantity guarantee;

      2. Casting blank datum alignment, 2D and 3D mold surface allowance inspection;

      3. Rough machining of 2D and 3D profile, non installation non working plane (including safety platform surface, buffer installation surface, pressing plate plane and side datum plane);

      4. Before semi finishing, the side datum should be aligned correctly to ensure the accuracy;

      5. Semi finish machining of 2D and 3D profile, finish machining of all kinds of installation working surfaces (including limit block installation surface and contact surface, insert installation surface and back side, punch installation surface, waste cutter installation surface and back side, spring installation surface and contact surface, all kinds of travel limit working surface, wedge installation surface and back side), semi finish machining of all kinds of guide surfaces and guide holes, leaving allowance for finish machining process Datum hole and height datum, and record data;

      6. Check and recheck the machining accuracy;

      7. Fitter setting process;

      8. Before finishing, align the reference surface of the process reference hole and check the allowance of the insert;

      9. Finish machining profile 2D, 3D, side punching profile and hole position, finish machining process reference hole and height reference, finish machining guide surface and guide hole;

      10. Check and recheck the machining accuracy.

      Jiangmen hardware accessories factory http://www.yijudc.com//


    主站蜘蛛池模板: 中文字幕日本人妻一区| 免费国产调教视频在线观看| 亚洲av影片在线观看| 镇雄县| 风韵丰满妇啪啪区老老熟女杏吧| 精品一二区| 国产精品亚洲国产| 高清av一区二区三区在线| 志丹县| 亚洲成a人网站在线看| 国产精品成人无码a 无码| 无码伊人久久大杳蕉中文无码| 亚洲一区二区三区精品在线看 | 亚洲免费无毛av一区二区三区| 新蔡县| 在线亚洲AV不卡一区二区| 日韩精品视频免费久久| 久99久精品免费视频热77| 国产精品视频一区二区三区观看| 亚洲老熟妇愉情magnet| 久久久久久岛国免费网站| 精品国产亚洲av成人一区| 两当县| 免费无码AⅤ片在线观看| 德州市| 三门峡市| 文安县| 日本加勒比东京热日韩| 男女日比免费观看视频| 久久高潮少妇视频免费| 错那县| 增城市| 鄂伦春自治旗| 午夜不卡亚洲视频| 被黑人操的嗷嗷叫视频| 久久人妻少妇中文字幕| 国产亚洲欧美在线播放网站 | 91精品亚洲一区二区三区| av黄片免费在线观看| 激情五月婷婷六月俺也去| 亚洲老熟妇愉情magnet|